Kev's Log Home Blog
Saturday, 16 November 2013
Deck Decked
The November is out again
Sun and shade
Missing 2 1/2 meters of decking, back to Brico depot!
The fan heater was not up to the night time temp so I fired up the pellet burner this evening!
Friday, 15 November 2013
Chicken Wire for grip!
Winter grip with chicken wire!
Ok! now they are in place and looking good
Marking out the handrail. Temp bottom step. Ready for the decking!
Bread and treadplate progress
Cutting out the treadplate
Treadplate in position
Lovely brown loaf ready for lunch today
Monday, 11 November 2013
More progress on the steps
Trial fit of the steps (in the dark)
Made from left-overs but should do the job!
Splash on some varnish!
Saturday, 9 November 2013
It's raining outside!
It's raining outside so here I am marking out the porch steps cut outs indoors
Cutting out the notches
This is what we are aiming for, X 8 wedges to make now
Thursday, 7 November 2013
More front door deck progress
One more roofing sheet to go
Late October sunshine
Early November and the guttering is up, Sat dish in the background is now pointing at the correct satellite
Starting work on the front door deck with Kev Lindasy
Working late on the design for the front door deck structure
Getting a good cut with beast and some help from Bernie
Kev cutting a corner out of the door frame
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)