Kev's Log Home Blog
Monday, 20 January 2014
Home made worktop
Pine planks glued and clamped
Sanding down to lumps in the winter sun
Sorted!
Sunday, 8 December 2013
Headlights and Kitchen units
IKEA Island unit ready to be transformed with lambris
Kitchen units by Working with Wood, painted by Anita
Attempt No3 at fitting continental headlights, one more to go before the CT!
Saturday, 16 November 2013
Deck Decked
The November is out again
Sun and shade
Missing 2 1/2 meters of decking, back to Brico depot!
The fan heater was not up to the night time temp so I fired up the pellet burner this evening!
Friday, 15 November 2013
Chicken Wire for grip!
Winter grip with chicken wire!
Ok! now they are in place and looking good
Marking out the handrail. Temp bottom step. Ready for the decking!
Bread and treadplate progress
Cutting out the treadplate
Treadplate in position
Lovely brown loaf ready for lunch today
Monday, 11 November 2013
More progress on the steps
Trial fit of the steps (in the dark)
Made from left-overs but should do the job!
Splash on some varnish!
Saturday, 9 November 2013
It's raining outside!
It's raining outside so here I am marking out the porch steps cut outs indoors
Cutting out the notches
This is what we are aiming for, X 8 wedges to make now
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)