Wednesday, 26 February 2014

T&G and Wind Turbines

Bathroom wall T&G getting finished at long last. This wood came back on my last UK trip balanced between the seats.

Had another look at the wind turbine going up down the road. Note the Hi-tech blades are sat on straw bales

The first two sections are now up, waiting for the BIG CRANE to be assembled and the next sections to be delivered.

Monday, 17 February 2014

Wind turbines and cables

The nearest turbine is going up

That is a big beast

This is where the wind energy will end up! getting the cables sorted before the last floor boards go down in the office

Saturday, 15 February 2014

Less space more flooringI

In order to get the floor down in the Salon all the "stuff" goes into the last space left!

Warm air ducting sits on top of the recycled paper insulation

Salon floor down, shuffle the "stuff" and get on with office floor

Widescreen shots by Kev Mk I

Widescreen shot by Kev Mk I and his i-phone

Darcie gets in Kev's indoor widescreen shot