Wednesday, 26 February 2014

T&G and Wind Turbines

Bathroom wall T&G getting finished at long last. This wood came back on my last UK trip balanced between the seats.

Had another look at the wind turbine going up down the road. Note the Hi-tech blades are sat on straw bales

The first two sections are now up, waiting for the BIG CRANE to be assembled and the next sections to be delivered.

No comments:

Post a Comment